Rail Transport

HONITON RAILWAY STATION

The waiting room, ticket hall and administration offices at Honiton Station were partially demolished and cleared.

During the works a temporary ticket hall, waiting room and staff areas were provided to enable continued operations of the station. The main steel frame and roof of the ticket hall was maintained while the rest of the areas were stripped out and demolished.

FARNBOROUGH RAILWAY STATION

The project is located at the Grade II Listed, main station building. Contractor Design elements were Mechanical & Electrical.

Works consisted of: