NEW PURE GYM POWERING TO COMPLETION!

Works to Pure Gym are nearing completion and we are focused on delivering this fast track project for our valued client.

Works were mainly cut and carve and included the formation of new acoustic walls, shaft walls on the first floor, intumescent coatings to existing steel beams as well as installation of new steels and a new floor.

The unit has also benefited from new glazing on both the ground floor and first floor.

The Tree House, Clapham

Well insulated, air tight timber framed two-bedroom house on 6.6m wide site with access restricted by the eponymous tree. The design strategy aimed to achieve a 'zero carbon' performance and the house was built to stringent standards.

This included high performance windows and whole house mechanical ventilation. The energy systems include rain water recycling, photo-voltaic generation of electricity and a system of hot water generation that combines a solar thermal panel with a vertical ground loop heat pump. Hot water is for both domestic use and underfloor heating.