Charing Cross Station

Here we designed and installed suspended ceilings and wall cladding over the escalator shaft whilst integrating a new lighting system. H.A. Marks had to undertake specialist design for the perimeter and ticket line bulkheads.

 

All bulkheads required to powder coated galvanised steel and integrated with other trades i.e CCTV and speaker systems.

 

Prefabrications and samples generated thought the design period to ensure compliance with current London Underground Infrastructure as well as new assets. We set up control measures to dust and ventilation services.