Residential

Residential

Apartment Refurbishments at 46 Finsborough Rd

The project was located on a busy road on the edge of the congestion zone. Deliveries and waste removal was carefully scheduled, as a red route existed on the road surrounding the property.

The apartment was reconfigured internally and underwent a full upgrade of plumbing, heating and electric, which included a new services intake. H A Marks have been awarded further refurbishment projects on the estate by Daniel Watney and Associates.

Du Cane Housing Association

H A Marks are working in partnership with Powerwall (www.powerwall.co.uk) to install off site manufactured modular units to the roof space of 5 existing blocks and infill between two pairs of blocks. The additional storey and infill will provide 44 new dwellings which have been designed to achieve code for sustainable homes level 3 and the client is aiming to achieve BREEAM ‘ Very Good ‘ rating.

28 The Street, West Horsley

Demolition of existing garden buildings and construction of a green oak framed pool house. Piled foundations were required due to poor ground conditions. The oak was obtained from local Hampshire estates and jointed on site.

Infill brickwork was laid in lime mortar. All joinery was manufactured from seasoned oak. Bricks and plain clay tiles were locally sourced and hand made. The project also involved the rebuilding of part of the existing listed oak framed house.

Battersea Park Estate

We are delighted to announce the completion of the above contract for Wandsworth Council. The works consisted of the installation of Heat Recovery Units to 285 Homes in Battersea Park Estate.

The units are designed to combat condensation within homes and have a unique feature whereby any heat loss is minimized through the installation of the Heat Recovery Unit. The works also involved electrical upgrade to the various properties.

Pages