Education

Education

Westbridge Primary School

The works consisted of the securing of the area and a full strip out with internal alterations, structural alterations to form new enlarged open plan Kitchen & Canteen Area.

The works were planned over some months prior to the School Summer Holidays with the design, approvals and supply of catering equipment being on a long lead time. We took possession of the site and dealt with the strip out promptly to get back to the shell core to enable our
Mechanical layout design to be checked and modelled.

Kelston Religous Education Centre

The buildings are 2 substantial Conjoined Victorian Houses overlooking Wandsworth Common. The client is a Religious Order who wished to convert the existing properties into a Retreat & Education Centre. The project was carried out in 2 phases with one property being occupied whilst the other was completed.

Works consisted of;

Garrat Park Primary School

The works consisted of the securing of the area and a full strip out with internal alterations, structural alterations to form new enlarged open plan Kitchen & Canteen Area. The works were planned over some months prior to the School Summer Holidays with the design, approvals and supply of catering equipment being on a long lead time.

Sunnyhill Primary School

27th April 2011

This exciting project is a 250m2 School Extension for Lambeth Education.
A piled Foundation solution proved a highly cost effective solution combined with our off-site Powerwall Space Frames technology.

We have supplied and installed the building using off-site volumetric pods. The installation of the pods successfully took place in 2 days on the 21st & 22nd April.

Pages